Chief XCB7000 Installation Manual Page 8

  • Download
  • Add to my manuals
  • Print
  • Page
    / 12
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 7
XCB7000 Installation Instructions
8
8. Tighten two 5/16" x 3/4" set screws (BB) through each array
head (FF) and against column. (See Figure 8)
Figure 8
Attaching Add-On Heads
1. Attach add-on head (GG) to existing array head using four
5/16 x 5/8" button head cap screws (JJ). (See Figure 9)
2. Repeat Step 1 for remaining add-on head.
Figure 9
Adding Mounting Rail
1. Slide four T-slot studs (EE - two in top mounting rail slot and
two in bottom) into end of mounting rail (MM). (See Figure 10)
Figure 10
2. Partially fasten one 5/16" lock nut (KK) to each stud on
upper T-slot studs.
3. Slide top T-slot studs (EE) with attached lock nuts (KK)
down into top openings on add-on heads (FF). (See Figure
11)
4.
Slide studs on lower T-slot studs (EE) into lower slots on
add-on heads (FF) while bringing mounting rail against add-
on heads.
IMPORTANT ! : Both mounting rails (MM) must be
located at the same height. One mounting rail must NOT
be higher than the other mounting rail.
5. Tighten array head to mounting rail by tightening lock nuts
on upper T-slot studs and adding two 5/16" lock nuts (KK) to
lower T-slot studs. (See Figure 6)
Figure 11
6. Repeat for remaining add-on head (FF).
8
(BB) x 2
(FF)
1
(JJ) x 4
(GG)
1
(EE) x 4
(MM)
(MM)
5
(KK) x 2
(FF)
Page view 7
1 2 3 4 5 6 7 8 9 10 11 12

Comments to this Manuals

No comments